Hope floats in marooned village

The flooding in the village was exacerbated when excess water was released from the Sindphana dam on September 22, even as the region was being battered by unprecedented rain. Connectivity is unlikely to be restored for at least another two days, as heavy discharges from the dam are expected to continue

Source link

Leave a Reply

Your email address will not be published. Required fields are marked *